25 C
Accra
Saturday, May 8, 2021
No menu items!

PHOTOS: Prez Akufo-Addo commissions Ghana’s first micro-hydro power station at Alavanyo

Must Read

Neymar signs new Paris St-Germain contract

Neymar has signed a contract extension with Paris St-Germain, keeping the Brazil forward at the French giants until 30...

Tanzanian city ‘running low on condoms’

Tanzania’s south-western city of Mbeya’s Councilors says the country is running out of condoms. The issue was reportedly raised at...

Eidul-Fitr Prayers can’t be held in large congregations – Chief Imam

The National Chief Imam, Sheikh Nuhu Sharabutu has declared that this year’s Eid-ul-Fitr Prayers and celebrations cannot be observed...

The President of the Republic, Nana Addo Dankwa Akufo-Addo, on Saturday, 21st November 2020, commissioned Ghana’s first micro power generating station, located at Tsatsadu, Alavanyo, in the Hohoe constituency of the Volta Region.

Describing the ceremony as “a happy day for the people of Alavanyo and myself”, President Akufo-Addo noted that the 45kw Tsatsadu hydro power generating station will “provide power for rapid economic development in Alavanyo.”

The origins of the project date back to 2005, when the Ministry of Energy, under the Government of President John Agyekum Kufuor, entered into a Memorandum of Understanding with the United Nations Industrial Development Organization (UNIDO) and International Network on Small Hydro Power of China (IN-SHP) to undertake studies geared towards the development of Small Hydro Power potentials in the country.

According to the President, before the project could be operationalized in the twenty-two (22) sites identified, the NPP lost the 2008 elections, and, “like many other important initiatives of the Kufuor Government, this project was also abandoned”.

Upon his assumption of office in 2017, he told the gathering at Tsatsadu that he directed the Ministry of Energy, together with the Bui Power Authority, to re-develop the hydro power generating stations, including that at Tsatsasu.

Indeed, the Tsatsadu project was initially designed as a 30kW stand-alone system, but was redesigned and upgraded to a 45kW grid-connection system based on the outcome of the additional studies.

With the project having been undertaken solely by Ghanaians, President Akufo-Addo stated that the construction of the power generating station did not have any adverse impact on the environment, adding that, since its energy source is green, it will have no carbon emissions.

The President assured the Togbega of Alavanyo that the road leading up to the Tsatsadu Generating Station is “under active development, and will be done”, stressing that “indeed, Alavanyo, it shall be well”.

In commending the Minister for Energy, John-Peter Amewu, who is the NPP’s parliamentary candidate for Hohoe, for his role in helping the cement the peace in Alavanyo, President Akufo-Addo stated that “all of this means the time has come for Hohoe to undergo a change, and to come to come to sit on the back of the elephant.”

The President, thus, urged residents of Tsatsadu, Alavanyo, and, indeed, Hohoe to vote massively for him and for John-Peter Amewu, “so we can do more for you.”

LEAVE A REPLY

Please enter your comment!
Please enter your name here

Latest News

Neymar signs new Paris St-Germain contract

Neymar has signed a contract extension with Paris St-Germain, keeping the Brazil forward at the French giants until 30...

Tanzanian city ‘running low on condoms’

Tanzania’s south-western city of Mbeya’s Councilors says the country is running out of condoms. The issue was reportedly raised at a meeting of Mbeya City...

Eidul-Fitr Prayers can’t be held in large congregations – Chief Imam

The National Chief Imam, Sheikh Nuhu Sharabutu has declared that this year’s Eid-ul-Fitr Prayers and celebrations cannot be observed in large congregations due to...

Majority Leader criticizes #Fixthecountry campaign saying it lacks basis

Front liners of the #Fixthecountry movement have launched a fresh hashtag called #NameAndShame on social media. With over 90,000 tweets the campaigners are tasking the...

Uber removes trip cancellation fees

Uber has announced that it will no longer charge trip cancellation fees. On Saturday, May 8, 2021, the company sent a message via email informing...

More Articles Like This