Search
Close this search box.
GBC
GHANA WEATHER

Aker Energy terminates agreement to build FPSO vessel

Facebook
Twitter
LinkedIn
WhatsApp
Pinterest

Aker Energy has terminated its agreement with Yinson for the provision of a purpose-built Floating Production Storage and Offloading (FPSO) vessel to be connected to a subsea production system at 2,400 meters below sea level as result of the COVID-19 pandemic.

This was revealed by the Select Committee on Energy and Mines in its reports on the 2021 draft annual budget estimates of the Ministry to Parliament.

According to the Committees’ Reports, Aker Energy postponed the development of the Deepwater Pecan Oilfield located Offshore Ghana in April, 2020 following the outbreak of COVID-19 pandemic and subsequent fall in oil prices.

Leave a Reply

Your email address will not be published. Required fields are marked *

ADVERTISEMENT